How long will the work take?

This will depend on the project and how much work needs to be done. We will explain the project plan and timelines with you before we start. As a guide a ground floor extension will typically take around 12-14 weeks to plan, including surveying and designing, submitting the planning application and structural calculations and drawings. The actual build will take a similar length of time after this. This is a broad estimate for a typical ground floor kitchen extension – if there is such a thing! Get in touch and we can discuss things further. 

Book your FREE survey

You can book online through our Contact us page, or via phone or email.